Hi,
I've set up 6 steps for my CVTEST, the last three steps are deck estimation, TC conversion, and TC conversion & Decks. When I try to change the speed on one of those last three, it will change the other drill to the last drill I was trying to change the speed of unless I exit out of the CVTEST setting and go back into it. Is there an easier way to do this so I can keep the drills the same but just change the speed manually when I want to?
Bookmarks